top of page
sorter banner

Quality engineering prevents numerous setbacks at the construction site.

Environmental Conditioning Project Review

Design and Review of Environmental Conditioning Project

visual icon

Detailed calculation report, design and sizing of ducts, careful selection of gratings, optimal choice of equipment, preparation of preliminary plans, development of precise executive plans and an exhaustive catalog of concepts.

fire system project

Design and Review of Fire Protection Systems.

visual icon

Rigorous compliance with regulations, exhaustive calculation memory, appropriate selection of pipes and accessories, efficient pumping systems, precise preparation of plans and a detailed catalog of concepts. In addition, implementation of advanced fire detection and protection systems.

Review of Electrical Installation Project

Design and Review of Electrical Installation Project

visual icon

Meticulous development of calculation reports, detailed equipment specifications, design of electrical feeders, preparation of preliminary plans, creation of precise final plans and exhaustive catalogs of concepts. Additionally, design and implementation of connection lines for high and medium voltage.

sorter banner

PROJECT REVIEW CAN GENERATEDECREASE IN COSTS

lighting project consulting

Design and Review of Lighting Project

visual icon

Design Criteria for Lighting, Preparation of Calculation Reports, Detailed Specifications of Luminaires, Preliminary Drawings of the Preliminary Project, Definitive Drawings and Exhaustive Catalog of Luminaires.

consulting in Hydrosanitary and Rainwater Project

Design and Review of Hydrosanitary and Rainwater Project

Comprehensive Design of Hydraulic, Sanitary, Rainwater and Gas Project. Includes Detailed Calculation Reports, Precise Drawings, Complete Technical Specifications and an Exhaustive Catalog of Concepts.

visual icon

Experiencia que Respalda Nuestro Compromiso con la Eficiencia en CEDIS

+9 Proyectos de CEDIS

+195,000 m2 Secos

+79,999 m2 Refrigerados

+210,000 bultos 

sorter banner

Most construction site problems are due to a lack of coordination between systems, architectural elements, and structural components.

Let our experts be your bridge to reliable solutions 

Thank you for your message!

bottom of page